Triple

T23682276
Position Surface form Disambiguated ID Type / Status
Subject William Preston Lane Jr. Memorial Bridge E585059 entity
Predicate instanceOf P0 FINISHED
Object dual-span bridge C21722 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: dual-span bridge
Context triple: [William Preston Lane Jr. Memorial Bridge, instanceOf, dual-span bridge]
  • A. twin-span bridge chosen
    A twin-span bridge is a structure composed of two parallel bridge spans, typically used to carry traffic in opposite directions or to increase capacity across a single crossing.
  • B. multi-span bridge
    A multi-span bridge is a bridge structure composed of multiple consecutive spans supported by intermediate piers or supports, allowing it to cross longer distances or multiple obstacles.
  • C. double-decked bridge
    A double-decked bridge is a bridge structure with two vertically stacked levels of roadway, rail, or pedestrian paths designed to separate and manage different types or directions of traffic.
  • D. single-span bridge
    A single-span bridge is a structure that crosses an obstacle with one uninterrupted span between two main supports, without intermediate piers or supports.
  • E. multipurpose bridge
    A multipurpose bridge is a structural crossing designed to support multiple concurrent uses—such as vehicular traffic, pedestrians, cyclists, utilities, and sometimes public spaces or transit systems—within a single integrated infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24901f7c08190909fd727632e823d completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 6:51 p.m.