Triple

T23679120
Position Surface form Disambiguated ID Type / Status
Subject AS-203 E584968 entity
Predicate instanceOf P0 FINISHED
Object Saturn IB test flight C8899 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Saturn IB test flight
Context triple: [AS-203, instanceOf, Saturn IB test flight]
  • A. Saturn V mobile launcher
    The Saturn V mobile launcher was a massive, self-contained launch platform and service structure that transported, supported, and provided umbilical connections to the Saturn V rocket from assembly to liftoff.
  • B. NASA rocket engine test facility
    A NASA rocket engine test facility is a specialized complex equipped with infrastructure, instrumentation, and safety systems to ground-test and validate rocket engines under controlled, flight-like conditions.
  • C. Apollo Lunar Module
    The Apollo Lunar Module was a two-stage, crewed spacecraft designed exclusively for lunar orbit operations and surface landings during NASA's Apollo missions.
  • D. Long Duration Propulsive EELV Secondary Payload Adapter mission
    A Long Duration Propulsive EELV Secondary Payload Adapter mission is a spaceflight that uses a propulsive ESPA ring on an Evolved Expendable Launch Vehicle to carry and operate secondary payloads for extended periods in space, providing independent maneuvering and mission flexibility separate from the primary payload.
  • E. orbital test flight chosen
    An orbital test flight is an initial or experimental space mission conducted to evaluate a spacecraft’s performance, systems, and safety while achieving and operating in Earth orbit.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24901f7c08190909fd727632e823d completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 6:51 p.m.