Triple
T23678936
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Phoenix Iron Company Foundry Building |
E584962
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | foundry building |
C22020
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: foundry building Context triple: [Phoenix Iron Company Foundry Building, instanceOf, foundry building]
-
A.
foundry
chosen
A foundry is an industrial facility where metal is melted and cast into specific shapes using molds for manufacturing parts and products.
-
B.
bell foundry
A bell foundry is a specialized workshop or factory where bells are designed, cast from molten metal, tuned, and finished for use in churches, public buildings, and other settings.
-
C.
shipbuilding facility
A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
-
D.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
-
E.
charcoal kiln complex
A charcoal kiln complex is a group of structures and facilities designed for the controlled carbonization of wood or other organic materials to produce charcoal on an industrial or semi-industrial scale.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24901f7c08190909fd727632e823d |
completed | April 17, 2026, 2:51 p.m. |
Created at: April 17, 2026, 6:51 p.m.