Triple

T2367119
Position Surface form Disambiguated ID Type / Status
Subject San Lázaro E46007 entity
Predicate hasBRTLine P37810 FINISHED
Object Metrobús Line 4 E55918 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Metrobús Line 4 | Statement: [San Lázaro, hasBRTLine, Metrobús Line 4]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Metrobús Line 4
Context triple: [San Lázaro, hasBRTLine, Metrobús Line 4]
  • A. Metrobús Line 3
    Metrobús Line 3 is a bus rapid transit corridor in Mexico City that runs along key north–south avenues, connecting several central neighborhoods and transfer points in the Metrobús network.
  • B. Metrobús Line 7
    Metrobús Line 7 is a bus rapid transit corridor in Mexico City that runs along major avenues such as Paseo de la Reforma, linking northern areas with the city center and key landmarks.
  • C. Mexibús Line IV
    Mexibús Line IV is a bus rapid transit line in the State of Mexico that serves the northern metropolitan area of Mexico City as part of the Mexibús system.
  • D. Metrobus Line 4 chosen
    Metrobus Line 4 is a Mexico City Metrobús bus rapid transit route that serves central areas including the Venustiano Carranza borough and provides key connections to the city’s historic center and airport.
  • E. Metrobús
    Metrobús is Mexico City’s bus rapid transit system, featuring dedicated lanes and high-capacity articulated buses to provide efficient urban transportation across the metropolis.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasBRTLine
Context triple: [San Lázaro, hasBRTLine, Metrobús Line 4]
  • A. hasTramway
    Indicates that a location or area is served by, contains, or is connected to a tramway system.
  • B. hasTrolleybusLine
    Indicates that there exists a trolleybus service or route connecting the related entities.
  • C. hasMetroLine
    Indicates that a location or area is served by, or connected to, a specific metro (subway) line.
  • D. hasShuttleLine
    Indicates that there is a shuttle service or route operating between the related entities.
  • E. hasLightRailSystem
    Indicates that a place possesses and operates a light rail transit system.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88a145268819083e2736cb835c696 completed March 4, 2026, 7:37 p.m.
NER Named-entity recognition batch_69abc74b6bdc8190a12b2bcaa2dd7616 completed March 7, 2026, 6:35 a.m.
NED1 Entity disambiguation (via context triple) batch_69aef0913e748190bbb5c54b86b415bd completed March 9, 2026, 4:08 p.m.
PD Predicate disambiguation batch_69abc59b88348190a2d6c08f69974117 completed March 7, 2026, 6:28 a.m.
PDg Predicate description generation batch_69abc6443c6c8190b932de2abd8eb28f completed March 7, 2026, 6:31 a.m.
Created at: March 4, 2026, 7:56 p.m.