Triple

T23666055
Position Surface form Disambiguated ID Type / Status
Subject WAB 103 E584579 entity
Predicate instanceOf P0 FINISHED
Object Bruckner work catalogue entry C26136 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Bruckner work catalogue entry
Context triple: [WAB 103, instanceOf, Bruckner work catalogue entry]
  • A. Tchaikovsky thematic catalogue entry
    A Tchaikovsky thematic catalogue entry is a bibliographic record that uniquely identifies one of Tchaikovsky’s works by listing its themes, incipits, scoring, dates, sources, and relevant scholarly references.
  • B. Mahler symphony cycle
    A Mahler symphony cycle is a complete recorded or performed series of Gustav Mahler’s symphonies, typically presented as an integrated artistic and interpretive project.
  • C. concert work
    A concert work is a musical composition created primarily for performance in a concert setting, typically emphasizing artistic expression over functional or theatrical purposes.
  • D. musical work catalogue number chosen
    A musical work catalogue number is a unique identifier assigned to a specific composition within a systematic catalog of a composer’s or repertoire’s works, used to distinguish and reference pieces unambiguously.
  • E. work for piano and orchestra
    A work for piano and orchestra is a concert piece in which a solo piano part interacts with and is accompanied by a full orchestral ensemble, often highlighting virtuosic and expressive dialogue between the two.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24901421881908c17a5293bdd4a8e completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 6:50 p.m.