Triple
T23663140
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Trent and Mersey Canal at Fradley Junction |
E584504
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | waterside leisure destination |
C27251
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: waterside leisure destination Context triple: [Trent and Mersey Canal at Fradley Junction, instanceOf, waterside leisure destination]
-
A.
watersports venue
A watersports venue is a designated location equipped and managed for hosting a variety of water-based recreational and competitive activities.
-
B.
waterfront hub
chosen
A waterfront hub is a central, mixed-use area located along a body of water that concentrates transportation, commerce, recreation, and social activities to connect people with the waterfront.
-
C.
public boating facility
A public boating facility is a designated area with infrastructure and services that provide public access to waterways for launching, docking, and maintaining recreational or commercial boats.
-
D.
coastal destination
A coastal destination is a travel location situated along a sea or ocean shoreline, offering beach-related recreation, scenic waterfront views, and marine-based activities.
-
E.
water-themed attraction
A water-themed attraction is a recreational venue or feature centered around water-based activities, environments, or spectacles designed for entertainment, relaxation, or adventure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e248ffc0888190ae23c4731eb8b7ac |
completed | April 17, 2026, 2:51 p.m. |
Created at: April 17, 2026, 6:50 p.m.