Triple
T2366004
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lake Express high-speed ferry |
E47380
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-speed ferry |
C4627
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-speed ferry Context triple: [Lake Express high-speed ferry, instanceOf, high-speed ferry]
-
A.
passenger ferry
chosen
A passenger ferry is a vessel designed to transport people, and sometimes light vehicles or cargo, across bodies of water on regular, short-distance routes.
-
B.
ferry service
A ferry service is a transportation operation that regularly carries passengers, vehicles, and sometimes cargo across bodies of water along fixed routes and schedules.
-
C.
auto ferry train
An auto ferry train is a specialized rail service designed to transport passengers along with their vehicles—such as cars, motorcycles, and small trucks—across long distances or through otherwise impassable routes like tunnels or mountainous regions.
-
D.
vehicle ferry
A vehicle ferry is a boat or ship designed to transport cars, trucks, and other vehicles, along with their passengers, across bodies of water.
-
E.
ferry terminal
A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88a1a4a6081908645b0f2914521ab |
completed | March 4, 2026, 7:38 p.m. |
Created at: March 4, 2026, 7:55 p.m.