Triple

T23656208
Position Surface form Disambiguated ID Type / Status
Subject Titograd–Nikšić railway line E584305 entity
Predicate instanceOf P0 FINISHED
Object railway in Montenegro C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway in Montenegro
Context triple: [Titograd–Nikšić railway line, instanceOf, railway in Montenegro]
  • A. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • B. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • C. transalpine railway
    A transalpine railway is a rail line that crosses or traverses the Alps, typically using tunnels, viaducts, and mountain passes to connect regions on either side of the mountain range.
  • D. railway line in Portugal
    A railway line in Portugal is a defined rail corridor within the Portuguese rail network, consisting of tracks, infrastructure, and associated facilities that support train operations between specified locations.
  • E. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e248ffc0888190ae23c4731eb8b7ac completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 6:49 p.m.