Triple

T23642933
Position Surface form Disambiguated ID Type / Status
Subject Yangjae Station E583949 entity
Predicate lineOpeningEvent P126243 FINISHED
Object Line 3 section opening between Gupabal and Yangjae LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 3 section opening between Gupabal and Yangjae | Statement: [Yangjae Station, lineOpeningEvent, Line 3 section opening between Gupabal and Yangjae]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: lineOpeningEvent
Context triple: [Yangjae Station, lineOpeningEvent, Line 3 section opening between Gupabal and Yangjae]
  • A. lineOpeningContext
    Indicates the contextual situation or circumstances present at the moment a line (e.g., of dialogue, text, or code) begins.
  • B. lineBOpened
    Indicates that a specific line B has been opened or activated, transitioning from a closed or inactive state.
  • C. lineSectionOpenedWith chosen
    Indicates that a specific section of a line (such as a route, track, or service line) has been officially opened or put into operation by a particular action or event.
  • D. lineOpeningPhase
    Indicates the phase or stage during which a line (such as a service, process, or system) is initially opened or brought into operation.
  • E. lineOpeningOperator
    Indicates that an operator is responsible for initiating or opening a line, such as a production line, communication line, or service line.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e248fefafc81909656921192f30e80 completed April 17, 2026, 2:51 p.m.
NER Named-entity recognition batch_69f1b2821cb881909b1ab77aa77208e0 completed April 29, 2026, 7:25 a.m.
PD Predicate disambiguation batch_69f118d7903c8190bb590a71771e93af completed April 28, 2026, 8:30 p.m.
Created at: April 17, 2026, 6:48 p.m.