Triple
T2363288
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Molecular Foundry |
E47322
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Department of Energy national scientific user facility |
C63
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Department of Energy national scientific user facility Context triple: [Molecular Foundry, instanceOf, Department of Energy national scientific user facility]
-
A.
U.S. Department of Energy field office
A U.S. Department of Energy field office is a regional operational unit that oversees, manages, and implements DOE programs, projects, and facilities within a specific geographic area.
-
B.
United States Department of Energy contractor
A United States Department of Energy contractor is an external organization or company that enters into a formal agreement with the DOE to provide specialized services, research, operations, or support for the nation’s energy, environmental, and nuclear security missions.
-
C.
research facility
chosen
A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
-
D.
fusion energy research facility
A fusion energy research facility is a specialized scientific complex where researchers design, build, and operate advanced experimental systems to achieve and study controlled nuclear fusion as a potential source of large-scale, low-carbon power.
-
E.
NASA facility
A NASA facility is a specialized site, such as a center, laboratory, or launch complex, operated or managed by NASA to support research, development, testing, and operations related to space and aeronautics missions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88a1a4a6081908645b0f2914521ab |
completed | March 4, 2026, 7:38 p.m. |
Created at: March 4, 2026, 7:55 p.m.