Triple
T23577446
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Maritime Link transmission line |
E580298
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | submarine and overhead transmission project |
C2938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: submarine and overhead transmission project Context triple: [Maritime Link transmission line, instanceOf, submarine and overhead transmission project]
-
A.
submarine telegraph cable network
A submarine telegraph cable network is an interconnected system of undersea cables and shore stations designed to transmit telegraphic signals across oceans and seas between distant locations.
-
B.
HVDC interconnector
An HVDC interconnector is a high-voltage direct current transmission link that connects separate power grids or regions to enable efficient long-distance electricity transfer and cross-border energy exchange.
-
C.
infrastructure project
chosen
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
D.
submarine escape training facility
A submarine escape training facility is a specialized center equipped with simulators, escape towers, and controlled water environments where submariners are trained in emergency escape procedures, survival techniques, and the use of escape equipment under realistic conditions.
-
E.
submarine channel
A submarine channel is an underwater valley-like feature on the seafloor formed by sediment-laden currents that transport and deposit sediments across continental margins and deep ocean basins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24601a9108190bc31e83833c980e4 |
completed | April 17, 2026, 2:38 p.m. |
Created at: April 17, 2026, 6:38 p.m.