Triple

T23570955
Position Surface form Disambiguated ID Type / Status
Subject Brighton Mail Centre E580108 entity
Predicate instanceOf P0 FINISHED
Object mail processing centre C25673 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mail processing centre
Context triple: [Brighton Mail Centre, instanceOf, mail processing centre]
  • A. post office
    A post office is a public facility where mail and parcels are sent, received, processed, and related postal services are provided to individuals and businesses.
  • B. postal administration
    A postal administration is the governmental or authorized organization responsible for managing and operating a country’s postal services, including mail collection, processing, transportation, and delivery.
  • C. postal infrastructure component chosen
    A postal infrastructure component is any physical or digital element—such as mailboxes, sorting centers, vehicles, or software systems—that enables the collection, processing, transport, and delivery of mail within a postal network.
  • D. postal law
    Postal law is the body of legal rules and regulations governing the operation, services, obligations, and liabilities of postal systems and mail delivery.
  • E. postal official
    A postal official is a government or postal service employee responsible for overseeing the processing, handling, and delivery of mail and related customer services within a postal system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24601a9108190bc31e83833c980e4 completed April 17, 2026, 2:38 p.m.
Created at: April 17, 2026, 6:36 p.m.