Triple

T23563396
Position Surface form Disambiguated ID Type / Status
Subject Barnsley Interchange E579302 entity
Predicate busStationManagedBy P42386 FINISHED
Object South Yorkshire Passenger Transport Executive NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Yorkshire Passenger Transport Executive | Statement: [Barnsley Interchange, busStationManagedBy, South Yorkshire Passenger Transport Executive]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: busStationManagedBy
Context triple: [Barnsley Interchange, busStationManagedBy, South Yorkshire Passenger Transport Executive]
  • A. isMainBusStationFor
    Indicates that one bus station serves as the primary or central station for a particular area, network, or service.
  • B. operatedStation chosen
    Indicates that one entity managed, ran, or was responsible for the operation of a particular station.
  • C. railStationManager
    Indicates that one entity manages, operates, or is responsible for the administration of a particular railway station.
  • D. railwayControlledBy
    Indicates that the operation, management, or authority over a railway is exercised by a specified controlling entity.
  • E. isRailwayStationInNetwork
    Indicates that a railway station belongs to, and is served as part of, a particular railway network.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245fe24588190888f3aec8407d8e3 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f1af6a02208190b7d35c4e5da67a44 completed April 29, 2026, 7:12 a.m.
PD Predicate disambiguation batch_69f118bcc0b08190b25a8dddfd461a0e completed April 28, 2026, 8:29 p.m.
Created at: April 17, 2026, 6:31 p.m.