Triple

T23553893
Position Surface form Disambiguated ID Type / Status
Subject DB Netz E578126 entity
Predicate instanceOf P0 FINISHED
Object rail infrastructure company division C13555 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rail infrastructure company division
Context triple: [DB Netz, instanceOf, rail infrastructure company division]
  • A. railroad operating division chosen
    A railroad operating division is a geographically defined segment of a railway system managed as a unit for train operations, crew assignments, dispatching, and maintenance activities.
  • B. railway construction company
    A railway construction company is an organization that plans, designs, and builds railway infrastructure, including tracks, stations, bridges, and related systems, often coordinating engineering, procurement, and project management activities.
  • C. railway holding company
    A railway holding company is a parent corporation that owns and controls one or more railway operating or infrastructure companies, managing their strategic direction and financial interests without necessarily running day-to-day train operations itself.
  • D. rail transport company
    A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
  • E. railway infrastructure manager
    A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245fa93448190919cb04534560542 completed April 17, 2026, 2:38 p.m.
Created at: April 17, 2026, 6:11 p.m.