Triple

T23553734
Position Surface form Disambiguated ID Type / Status
Subject Pankow-Heinersdorf (approximate corridor toward Ahrensfelde) E578122 entity
Predicate instanceOf P0 FINISHED
Object transport planning corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport planning corridor
Context triple: [Pankow-Heinersdorf (approximate corridor toward Ahrensfelde), instanceOf, transport planning corridor]
  • A. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • B. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • C. development corridor
    A development corridor is a strategically planned geographic area, often aligned along major transportation routes, where concentrated investment in infrastructure, industry, and services is used to stimulate economic growth and regional integration.
  • D. transportation corridors collection
    A transportation corridors collection is an organized set of linear pathways—such as roads, railways, and transit routes—grouped for managing, analyzing, or planning movement across a region.
  • E. regional transport plan
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245fa93448190919cb04534560542 completed April 17, 2026, 2:38 p.m.
Created at: April 17, 2026, 6:11 p.m.