Triple

T23539969
Position Surface form Disambiguated ID Type / Status
Subject Quebec Autoroute 25 E577714 entity
Predicate abbreviation P43 FINISHED
Object A-25 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A-25 | Statement: [Quebec Autoroute 25, abbreviation, A-25]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A-25
Context triple: [Quebec Autoroute 25, abbreviation, A-25]
  • A. A-25 chosen
    A-25 is a major Quebec autoroute that runs through the Montreal region, connecting the island of Montreal to the Lanaudière area via the Louis-Hippolyte Lafontaine Bridge–Tunnel and the Olivier-Charbonneau Bridge.
  • B. A-2
    The A-2 is a major Spanish motorway that connects Madrid with northeastern regions such as Zaragoza and Barcelona, forming part of the country’s primary eastward transport corridor.
  • C. A-23
    A-23 is the internal station code assigned to Warsaw's Młociny metro station on Line M1.
  • D. A-22
    The A-22 is a Spanish autovía (motorway) in northeastern Spain that connects the city of Huesca with Lleida, improving regional links including access to Monzón.
  • E. A-21
    A-21 is the station code assigned to Stare Bielany, a stop on the Warsaw Metro system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245f9d5d08190a4a20004e1784e20 completed April 17, 2026, 2:38 p.m.
NER Named-entity recognition batch_69f1ae1a66b88190811b38523ea606fe completed April 29, 2026, 7:07 a.m.
Created at: April 17, 2026, 6:10 p.m.