Triple
T23526189
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dholera taluka |
E576438
|
entity |
| Predicate | partOfPlanningCorridor |
P55551
|
FINISHED |
| Object | Delhi–Mumbai Industrial Corridor |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Delhi–Mumbai Industrial Corridor | Statement: [Dholera taluka, partOfPlanningCorridor, Delhi–Mumbai Industrial Corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Delhi–Mumbai Industrial Corridor Context triple: [Dholera taluka, partOfPlanningCorridor, Delhi–Mumbai Industrial Corridor]
-
A.
Delhi–Mumbai Industrial Corridor Project
chosen
The Delhi–Mumbai Industrial Corridor Project is a major infrastructure and industrial development initiative in India aimed at creating a high-tech manufacturing and logistics belt between Delhi and Mumbai.
-
B.
Chennai–Bengaluru Industrial Corridor
The Chennai–Bengaluru Industrial Corridor is a major infrastructure and economic development project in southern India aimed at boosting manufacturing, logistics, and urban growth between the cities of Chennai and Bengaluru.
-
C.
Mumbai–Bengaluru corridor
The Mumbai–Bengaluru corridor is a major economic and transport axis in western and southern India, linking the financial hub of Mumbai with the technology and industrial center of Bengaluru through a network of highways and rail routes.
-
D.
Delhi–Mumbai Industrial Corridor region
The Delhi–Mumbai Industrial Corridor region is a major planned industrial and infrastructure development zone spanning several Indian states between Delhi and Mumbai, aimed at boosting manufacturing, logistics, and urban growth.
-
E.
Delhi–Ahmedabad rail corridor
The Delhi–Ahmedabad rail corridor is a major railway route in India connecting the national capital Delhi with the commercial hub Ahmedabad, passing through key cities in northern and western India.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: partOfPlanningCorridor Context triple: [Dholera taluka, partOfPlanningCorridor, Delhi–Mumbai Industrial Corridor]
-
A.
partOfPlanningRegion
chosen
Indicates that one entity is included within, or belongs to, a larger designated planning region.
-
B.
partOfRailwayCorridor
Indicates that one entity is a segment, component, or area belonging to or contained within a specific railway corridor.
-
C.
locationOfPlanning
Indicates the place or setting where the planning activity or process occurs.
-
D.
partOfUrbanPlanBy
Indicates that something is included as a component or element within an urban plan created or overseen by a specified agent.
-
E.
plannedArea
Indicates that an area is designated or intended for a specific planned use or development.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245f5a8848190a2ba42e271c6c31f |
completed | April 17, 2026, 2:38 p.m. |
| NER | Named-entity recognition | batch_69f1ac73be64819083e4a1c2c09551fb |
completed | April 29, 2026, 7 a.m. |
| PD | Predicate disambiguation | batch_69f1189d75b48190a1c01928a993c9fb |
completed | April 28, 2026, 8:29 p.m. |
Created at: April 17, 2026, 6:09 p.m.