Triple

T23501137
Position Surface form Disambiguated ID Type / Status
Subject Maine State Route 46 E571845 entity
Predicate terminusA P388 FINISHED
Object U.S. Route 1A in Holden, Maine NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 1A in Holden, Maine | Statement: [Maine State Route 46, terminusA, U.S. Route 1A in Holden, Maine]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 1A in Holden, Maine
Context triple: [Maine State Route 46, terminusA, U.S. Route 1A in Holden, Maine]
  • A. US Route 1 in Houlton, Maine
    US Route 1 in Houlton, Maine is a segment of the major north–south U.S. highway that serves as a key local and regional connector near the Canadian border in northern Maine.
  • B. U.S. Route 1 in Ellsworth, Maine
    U.S. Route 1 in Ellsworth, Maine is a major coastal highway corridor that serves as a key commercial and transportation route through the city and the Downeast region.
  • C. U.S. Route 1 in Washburn, Maine
    U.S. Route 1 in Washburn, Maine is a segment of the major north–south U.S. highway running through the town of Washburn in Aroostook County.
  • D. U.S. Route 1 in Warren, Maine
    U.S. Route 1 in Warren, Maine is a major coastal highway corridor that serves as a key regional route for traffic and commerce along Maine’s midcoast.
  • E. U.S. Route 1 in Maine
    U.S. Route 1 in Maine is a major north–south highway that runs along the state’s Atlantic coast and through rural inland areas, linking numerous communities and serving as a key scenic and commercial corridor.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: U.S. Route 1A in Holden, Maine
Target entity description: U.S. Route 1A in Holden, Maine is a segment of the U.S. Highway System that serves as an alternate route to U.S. Route 1, connecting the Bangor area with coastal and Down East communities.
  • A. US Route 1 in Houlton, Maine
    US Route 1 in Houlton, Maine is a segment of the major north–south U.S. highway that serves as a key local and regional connector near the Canadian border in northern Maine.
  • B. U.S. Route 1 in Ellsworth, Maine
    U.S. Route 1 in Ellsworth, Maine is a major coastal highway corridor that serves as a key commercial and transportation route through the city and the Downeast region.
  • C. U.S. Route 1 in Washburn, Maine
    U.S. Route 1 in Washburn, Maine is a segment of the major north–south U.S. highway running through the town of Washburn in Aroostook County.
  • D. U.S. Route 1 in Warren, Maine
    U.S. Route 1 in Warren, Maine is a major coastal highway corridor that serves as a key regional route for traffic and commerce along Maine’s midcoast.
  • E. U.S. Route 1 in Maine
    U.S. Route 1 in Maine is a major north–south highway that runs along the state’s Atlantic coast and through rural inland areas, linking numerous communities and serving as a key scenic and commercial corridor.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b4829881909b77a70e942bbd54 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1a8fc37908190af86a01ab85737d6 completed April 29, 2026, 6:45 a.m.
Created at: April 17, 2026, 6:06 p.m.