Triple

T23490729
Position Surface form Disambiguated ID Type / Status
Subject Yolo Bypass E570664 entity
Predicate partOf P40 FINISHED
Object Sacramento River Flood Control Project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sacramento River Flood Control Project | Statement: [Yolo Bypass, partOf, Sacramento River Flood Control Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sacramento River Flood Control Project
Context triple: [Yolo Bypass, partOf, Sacramento River Flood Control Project]
  • A. Central Valley Project
    The Central Valley Project is a large-scale federal water management system in California that stores and delivers water for agriculture, cities, and environmental uses across the Central Valley.
  • B. Napa River Flood Protection Project
    The Napa River Flood Protection Project is a comprehensive civil works initiative in Napa, California, designed to reduce flooding risks while restoring river habitats and integrating recreational and environmental enhancements into the riverfront.
  • C. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • D. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • E. Sacramento River watershed infrastructure chosen
    Sacramento River watershed infrastructure comprises the network of dams, reservoirs, levees, canals, and related facilities that manage water supply, flood control, and ecosystem conditions throughout the Sacramento River basin in Northern California.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b0b01481908f636939bedd804c completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1a7dba7388190a322ab059bb6522a completed April 29, 2026, 6:40 a.m.
Created at: April 17, 2026, 6:04 p.m.