Triple
T23490714
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yolo Bypass |
E570664
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineered floodplain |
C18289
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineered floodplain Context triple: [Yolo Bypass, instanceOf, engineered floodplain]
-
A.
engineered waterway
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
B.
artificial embankment
An artificial embankment is a man-made raised structure of earth, rock, or other materials built to contain, redirect, or protect land and infrastructure from water or other environmental forces.
-
C.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
D.
flood control facility
chosen
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
E.
man-made basin
A man-made basin is an artificially constructed depression or container designed to hold or manage water or other liquids for purposes such as storage, irrigation, drainage, or industrial use.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245b0b01481908f636939bedd804c |
completed | April 17, 2026, 2:37 p.m. |
Created at: April 17, 2026, 6:04 p.m.