Triple

T23489764
Position Surface form Disambiguated ID Type / Status
Subject Short Service Commission E570636 entity
Predicate rankOnCommission P124515 FINISHED
Object Lieutenant (Indian Army) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lieutenant (Indian Army) | Statement: [Short Service Commission, rankOnCommission, Lieutenant (Indian Army)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: rankOnCommission
Context triple: [Short Service Commission, rankOnCommission, Lieutenant (Indian Army)]
  • A. typicalRankOnCommission
    Indicates the usual or standard rank an individual holds while serving on a particular commission.
  • B. commissionStatus
    Indicates the current state or phase of a commission-related process, such as whether it is pending, active, completed, or cancelled.
  • C. commissionType
    Indicates the specific kind or category of commission arrangement that applies to a given transaction or relationship.
  • D. unit2Commissioned
    Indicates that a second unit has been formally placed into active service or operation.
  • E. rankUponCommissioning chosen
    Indicates the military or official rank an individual holds at the moment they are formally commissioned into service or a specific role.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245b0b01481908f636939bedd804c completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1a7dba7388190a322ab059bb6522a completed April 29, 2026, 6:40 a.m.
PD Predicate disambiguation batch_69f0620ac3608190b36916261ea50f54 completed April 28, 2026, 7:30 a.m.
Created at: April 17, 2026, 6:04 p.m.