Triple

T23477092
Position Surface form Disambiguated ID Type / Status
Subject Kevin P. Chilton E570292 entity
Predicate notableWork P4 FINISHED
Object Space Shuttle mission STS-59 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Space Shuttle mission STS-59 | Statement: [Kevin P. Chilton, notableWork, Space Shuttle mission STS-59]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Space Shuttle mission STS-59
Context triple: [Kevin P. Chilton, notableWork, Space Shuttle mission STS-59]
  • A. Space Shuttle mission STS-39
    Space Shuttle mission STS-39 was a 1991 Department of Defense–focused flight of orbiter Discovery that conducted classified military experiments and atmospheric research in low Earth orbit.
  • B. Space Shuttle mission STS-49
    Space Shuttle mission STS-49 was the 1992 maiden flight of Endeavour, highlighted by the first and only three-astronaut spacewalk to capture and repair the stranded Intelsat VI communications satellite.
  • C. Space Shuttle mission STS-66
    Space Shuttle mission STS-66 was a 1994 NASA flight of orbiter Atlantis focused on studying Earth's atmosphere and climate using the ATLAS-3 and CRISTA-SPAS experiments.
  • D. Space Shuttle mission STS-51-I
    Space Shuttle mission STS-51-I was a 1985 NASA flight of orbiter Discovery focused on deploying and repairing communications satellites in low Earth orbit.
  • E. Space Shuttle mission STS-51-C
    Space Shuttle mission STS-51-C was a 1985 classified U.S. Department of Defense flight of the orbiter Discovery, notable as the first space mission flown by astronaut Ellison Onizuka.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Space Shuttle mission STS-59
Target entity description: Space Shuttle mission STS-59 was a 1994 Endeavour flight dedicated to Earth observation and radar imaging as part of NASA’s Space Radar Laboratory program.
  • A. Space Shuttle mission STS-39
    Space Shuttle mission STS-39 was a 1991 Department of Defense–focused flight of orbiter Discovery that conducted classified military experiments and atmospheric research in low Earth orbit.
  • B. Space Shuttle mission STS-49
    Space Shuttle mission STS-49 was the 1992 maiden flight of Endeavour, highlighted by the first and only three-astronaut spacewalk to capture and repair the stranded Intelsat VI communications satellite.
  • C. Space Shuttle mission STS-66
    Space Shuttle mission STS-66 was a 1994 NASA flight of orbiter Atlantis focused on studying Earth's atmosphere and climate using the ATLAS-3 and CRISTA-SPAS experiments.
  • D. Space Shuttle mission STS-51-I
    Space Shuttle mission STS-51-I was a 1985 NASA flight of orbiter Discovery focused on deploying and repairing communications satellites in low Earth orbit.
  • E. Space Shuttle mission STS-51-C
    Space Shuttle mission STS-51-C was a 1985 classified U.S. Department of Defense flight of the orbiter Discovery, notable as the first space mission flown by astronaut Ellison Onizuka.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245af8a88819084f2704f6d265a92 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1a74dbea8819085ca84391039e7f7 completed April 29, 2026, 6:38 a.m.
Created at: April 17, 2026, 6:01 p.m.