Triple
T23471718
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kajaki Dam |
E570146
|
entity |
| Predicate | hasTurbine |
P32979
|
FINISHED |
| Object | Unit 3 |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Unit 3 | Statement: [Kajaki Dam, hasTurbine, Unit 3]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Unit 3 Context triple: [Kajaki Dam, hasTurbine, Unit 3]
-
A.
Unit 2
Unit 2 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, part of one of the world’s largest nuclear generating stations.
-
B.
Unit 2
Unit 2 is the second coal-fired generating unit of the Port Qasim Coal Power Project in Pakistan, contributing a significant share of the plant’s total electricity output.
-
C.
Unit 5
Unit 5 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, contributing to its electricity generation capacity.
-
D.
Unit 6
Unit 6 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, among the largest nuclear generating stations in the world.
-
E.
Unit 7
Unit 7 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, among the largest nuclear generating stations in the world.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Unit 3 Target entity description: Unit 3 is a hydroelectric generating turbine unit at Afghanistan’s Kajaki Dam, contributing to the dam’s power production capacity.
-
A.
Unit 2
Unit 2 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, part of one of the world’s largest nuclear generating stations.
-
B.
Unit 2
Unit 2 is the second coal-fired generating unit of the Port Qasim Coal Power Project in Pakistan, contributing a significant share of the plant’s total electricity output.
-
C.
Unit 5
Unit 5 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, contributing to its electricity generation capacity.
-
D.
Unit 6
Unit 6 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, among the largest nuclear generating stations in the world.
-
E.
Unit 7
Unit 7 is one of the nuclear reactor units at Japan's Kashiwazaki-Kariwa Nuclear Power Plant, among the largest nuclear generating stations in the world.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245af8a88819084f2704f6d265a92 |
completed | April 17, 2026, 2:37 p.m. |
| NER | Named-entity recognition | batch_69f1a700bd0481908047aa4678217cbd |
completed | April 29, 2026, 6:36 a.m. |
Created at: April 17, 2026, 5:55 p.m.