Triple

T23471704
Position Surface form Disambiguated ID Type / Status
Subject Kajaki Dam E570146 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Kajaki Hydroelectric Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kajaki Hydroelectric Power Plant | Statement: [Kajaki Dam, hasHydroelectricPlant, Kajaki Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kajaki Hydroelectric Power Plant
Context triple: [Kajaki Dam, hasHydroelectricPlant, Kajaki Hydroelectric Power Plant]
  • A. Kanaker Hydroelectric Power Station
    Kanaker Hydroelectric Power Station is a hydroelectric power plant in Armenia that harnesses the flow of the Razdan River to generate electricity as part of the country’s energy infrastructure.
  • B. Larji Hydroelectric Power Station
    Larji Hydroelectric Power Station is a run-of-the-river hydroelectric facility in Himachal Pradesh, India, that generates electricity using water from the Beas River.
  • C. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • D. Rjukan Hydroelectric Power Station
    Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
  • E. Jefferies Hydroelectric Station
    Jefferies Hydroelectric Station is a hydroelectric power facility in South Carolina that generates electricity using water from Lake Moultrie as part of the Santee Cooper power system.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kajaki Hydroelectric Power Plant
Target entity description: Kajaki Hydroelectric Power Plant is a major hydroelectric facility in Afghanistan that generates electricity from the waters impounded by the Kajaki Dam on the Helmand River.
  • A. Kanaker Hydroelectric Power Station
    Kanaker Hydroelectric Power Station is a hydroelectric power plant in Armenia that harnesses the flow of the Razdan River to generate electricity as part of the country’s energy infrastructure.
  • B. Larji Hydroelectric Power Station
    Larji Hydroelectric Power Station is a run-of-the-river hydroelectric facility in Himachal Pradesh, India, that generates electricity using water from the Beas River.
  • C. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • D. Rjukan Hydroelectric Power Station
    Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
  • E. Jefferies Hydroelectric Station
    Jefferies Hydroelectric Station is a hydroelectric power facility in South Carolina that generates electricity using water from Lake Moultrie as part of the Santee Cooper power system.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245af8a88819084f2704f6d265a92 completed April 17, 2026, 2:37 p.m.
NER Named-entity recognition batch_69f1a700bd0481908047aa4678217cbd completed April 29, 2026, 6:36 a.m.
Created at: April 17, 2026, 5:55 p.m.