Triple

T23468860
Position Surface form Disambiguated ID Type / Status
Subject Ekiti Agro-Allied International Airport E569170 entity
Predicate instanceOf P0 FINISHED
Object airport project C44526 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: airport project
Context triple: [Ekiti Agro-Allied International Airport, instanceOf, airport project]
  • A. airport infrastructure project chosen
    An airport infrastructure project is a coordinated set of planning, design, construction, and upgrade activities aimed at developing or improving airport facilities, systems, and services to support safe, efficient air transportation.
  • B. airport under construction
    An airport under construction is a partially built air transport facility where runways, terminals, and support infrastructure are actively being developed but not yet operational for regular flight services.
  • C. airport system
    An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
  • D. aviation infrastructure plan
    An aviation infrastructure plan is a strategic blueprint that outlines the development, expansion, maintenance, and integration of airport facilities, airspace systems, and supporting services to safely and efficiently meet current and future air transportation needs.
  • E. Airport
    An airport is a complex transportation hub where aircraft take off, land, are serviced, and passengers and cargo transition between air and ground travel through various terminals and support facilities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2458ebd808190b3298163132cfb0b completed April 17, 2026, 2:37 p.m.
Created at: April 17, 2026, 5:54 p.m.