Triple
T23458820
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Antony, France |
E568008
|
entity |
| Predicate | hasTransportConnection |
P845
|
FINISHED |
| Object | N20 road |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: N20 road | Statement: [Antony, France, hasTransportConnection, N20 road]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: N20 road Context triple: [Antony, France, hasTransportConnection, N20 road]
-
A.
N20 road
chosen
The N20 road is a major French national highway that connects Paris to Toulouse, passing through several towns and cities in central France.
-
B.
N20 road
The N20 road is a major national primary route in Ireland that connects the cities of Cork and Limerick, passing through several towns in County Cork and County Limerick.
-
C.
N201 road
The N201 road is a major regional highway in the Netherlands that connects several towns and cities in North Holland and Utrecht, serving as an important east–west transport route.
-
D.
N200 road
The N200 road is a major Dutch roadway in North Holland that connects Amsterdam with Haarlem and the coastal town of Zandvoort.
-
E.
N207 road
The N207 road is a regional highway in the western Netherlands that connects several towns in South and North Holland and serves as an important north–south route through the Green Heart area.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2458b4c888190b1d7998f9862a558 |
completed | April 17, 2026, 2:36 p.m. |
| NER | Named-entity recognition | batch_69f1a699c0088190a84d7a495a3e3d61 |
completed | April 29, 2026, 6:35 a.m. |
Created at: April 17, 2026, 5:53 p.m.