Triple

T2345609
Position Surface form Disambiguated ID Type / Status
Subject Kyle Field E45122 entity
Predicate postRenovationCapacity P36075 FINISHED
Object over 102000 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: over 102000 | Statement: [Kyle Field, postRenovationCapacity, over 102000]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: postRenovationCapacity
Context triple: [Kyle Field, postRenovationCapacity, over 102000]
  • A. capacityAfterRenovation chosen
    Indicates the number of occupants or units a place can hold once renovation work has been completed.
  • B. renovationResult
    Indicates the outcome or state produced by a renovation process, linking the renovation activity to its resulting condition or product.
  • C. hasRenovation
    Indicates that an entity has undergone, is undergoing, or is associated with a renovation process or renovation event.
  • D. renovationCompleted
    Indicates that a renovation process for an entity has been fully finished and is no longer in progress.
  • E. brokeGroundForRenovation
    Indicates that an entity initiated construction work to renovate or significantly upgrade another entity or site.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88917935081909b755dbf38e81024 completed March 4, 2026, 7:33 p.m.
NER Named-entity recognition batch_69abcade3c808190ab3803538ccbe620 completed March 7, 2026, 6:51 a.m.
PD Predicate disambiguation batch_69abc59616a8819099711834e6f1ccd6 completed March 7, 2026, 6:28 a.m.
Created at: March 4, 2026, 7:52 p.m.