Triple

T23436778
Position Surface form Disambiguated ID Type / Status
Subject Pepco Benning Road power plant site E563484 entity
Predicate instanceOf P0 FINISHED
Object industrial brownfield site C5370 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: industrial brownfield site
Context triple: [Pepco Benning Road power plant site, instanceOf, industrial brownfield site]
  • A. industrial site
    An industrial site is a designated area of land developed and equipped with infrastructure and facilities for manufacturing, processing, storage, or other large-scale industrial operations.
  • B. industrial waste site
    An industrial waste site is a designated area where byproducts, residues, and discarded materials from industrial processes are stored, treated, or disposed of, often requiring specialized management to prevent environmental contamination.
  • C. former industrial plant chosen
    A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
  • D. industrial plant
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • E. Superfund site
    A Superfund site is a contaminated location in the United States designated by the Environmental Protection Agency for long-term cleanup of hazardous substances and pollutants under the Superfund program.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24553980c8190bb66a2ae0bdab125 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 5:50 p.m.