Triple

T23434427
Position Surface form Disambiguated ID Type / Status
Subject Superior General of the Priests of the Sacred Heart E563417 entity
Predicate instanceOf P0 FINISHED
Object superior general C47680 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: superior general
Context triple: [Superior General of the Priests of the Sacred Heart, instanceOf, superior general]
  • A. colonel general
    A colonel general is a high-ranking military officer, typically above lieutenant general and below full general, responsible for commanding large formations or holding senior staff positions.
  • B. general of the army
    A general of the army is the highest-ranking military officer responsible for overseeing large-scale strategic planning, command, and coordination of an entire nation's land forces.
  • C. colonial commander
    A colonial commander is a military leader responsible for overseeing, directing, and maintaining control over armed forces and local governance within a colony on behalf of an imperial power.
  • D. Chief of the Army General Staff
    The Chief of the Army General Staff is the highest-ranking professional officer responsible for directing, coordinating, and overseeing the planning, operations, and administration of a nation's army.
  • E. commander
    A commander is a leader who directs and coordinates the actions of others, typically within a military or organized group, to achieve strategic objectives.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24553980c8190bb66a2ae0bdab125 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 5:49 p.m.