Triple

T23426251
Position Surface form Disambiguated ID Type / Status
Subject Mostar interchange E560802 entity
Predicate connects P390 FINISHED
Object Belgrade–Zagreb highway corridor NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Belgrade–Zagreb highway corridor | Statement: [Mostar interchange, connects, Belgrade–Zagreb highway corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Belgrade–Zagreb highway corridor
Context triple: [Mostar interchange, connects, Belgrade–Zagreb highway corridor]
  • A. Belgrade–Zagreb highway chosen
    The Belgrade–Zagreb highway is a major motorway in the Balkans that connects the capitals of Serbia and Croatia as part of the key transport corridor between Central and Southeast Europe.
  • B. Belgrade–Valjevo road corridor
    The Belgrade–Valjevo road corridor is a key regional transport route in Serbia that links the capital Belgrade with the city of Valjevo and intermediate municipalities such as Lazarevac.
  • C. Belgrade–Niš highway
    The Belgrade–Niš highway is a major Serbian motorway that connects the capital Belgrade with the city of Niš, forming a key segment of the country’s primary north–south transport corridor.
  • D. Belgrade–Novi Sad corridor
    The Belgrade–Novi Sad corridor is a major transport route in Serbia connecting the capital Belgrade with the city of Novi Sad and serving as a key link in regional road and rail networks.
  • E. Zagreb–Split corridor
    The Zagreb–Split corridor is a major Croatian transport route linking the capital city Zagreb with the coastal city of Split, serving as a key connection between inland and Adriatic regions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454cb1108190ab21ada5411a7146 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f1a54a28a08190add6184a44c5005b completed April 29, 2026, 6:29 a.m.
Created at: April 17, 2026, 5:47 p.m.