Triple

T23412098
Position Surface form Disambiguated ID Type / Status
Subject Antwerp metropolitan area E560096 entity
Predicate europeanTransportCorridor P116350 FINISHED
Object Rhine–Alpine corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rhine–Alpine corridor | Statement: [Antwerp metropolitan area, europeanTransportCorridor, Rhine–Alpine corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Rhine–Alpine corridor
Context triple: [Antwerp metropolitan area, europeanTransportCorridor, Rhine–Alpine corridor]
  • A. Rhine–Alpine freight corridor chosen
    The Rhine–Alpine freight corridor is a major European rail and inland waterway route that connects North Sea ports with industrial regions in the Rhine and Alpine areas, facilitating high-volume international cargo transport.
  • B. Basel–Mulhouse–Freiburg transport corridor
    The Basel–Mulhouse–Freiburg transport corridor is a major transnational hub in the Upper Rhine region that integrates road, rail, and air links between France, Switzerland, and Germany around the tri-city area.
  • C. Munich–Lake Constance transport corridor
    The Munich–Lake Constance transport corridor is a major transit route in southern Germany linking the Munich metropolitan area with the Lake Constance region via road and other transport infrastructure.
  • D. Milan–Lugano–Zurich corridor
    The Milan–Lugano–Zurich corridor is a key transalpine urban and transport axis linking northern Italy with central Switzerland, integrating major economic, financial, and logistics hubs across the two countries.
  • E. Paris–northern Europe corridor
    The Paris–northern Europe corridor is a major trans-European transport route linking the Paris region with key economic and port centers in northern Europe.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: europeanTransportCorridor
Context triple: [Antwerp metropolitan area, europeanTransportCorridor, Rhine–Alpine corridor]
  • A. partOfEconomicCorridor
    Indicates that one entity is included within, or constitutes a segment of, a larger defined economic corridor.
  • B. shareEconomicCorridor
    Indicates that two or more entities are connected by, or participate in, the same economic corridor for trade, transport, or development activities.
  • C. hasEuropeanRoute
    Indicates that a road or segment is designated as part of a specific European route within the trans-European road network.
  • D. mainEconomicCorridorOf
    Indicates that one entity serves as the primary economic corridor or principal route for trade and economic activity of another entity.
  • E. connectsToInternationalCorridor chosen
    Indicates that an entity has a direct linkage or access to an international transportation or trade corridor.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454b3a5881909c64773dc8a5d289 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f1a5124a54819087a7ae2f8a5b3dc0 completed April 29, 2026, 6:28 a.m.
PD Predicate disambiguation batch_69f061ed34288190a2e5e8cae03b0095 completed April 28, 2026, 7:29 a.m.
Created at: April 17, 2026, 5:38 p.m.