Triple

T23402938
Position Surface form Disambiguated ID Type / Status
Subject Santee Cooper Lakes E559555 entity
Predicate createdBy P806 FINISHED
Object Santee Cooper Hydroelectric and Navigation Project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Santee Cooper Hydroelectric and Navigation Project | Statement: [Santee Cooper Lakes, createdBy, Santee Cooper Hydroelectric and Navigation Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Santee Cooper Hydroelectric and Navigation Project
Context triple: [Santee Cooper Lakes, createdBy, Santee Cooper Hydroelectric and Navigation Project]
  • A. Santee Cooper hydropower project chosen
    The Santee Cooper hydropower project is a large New Deal–era public works development in South Carolina that created lakes and dams to generate hydroelectric power and support regional economic growth.
  • B. Yazoo Backwater Project
    The Yazoo Backwater Project is a long-debated U.S. Army Corps of Engineers flood-control initiative in Mississippi’s Yazoo River basin, best known for its controversial proposed pumping station and its environmental and political disputes.
  • C. Catawba–Wateree Hydroelectric Project
    The Catawba–Wateree Hydroelectric Project is a system of dams, reservoirs, and power stations along the Catawba and Wateree rivers in the Carolinas that generates hydroelectric power and provides water resource management and recreation.
  • D. Savannah River hydropower system
    The Savannah River hydropower system is a network of dams and related infrastructure on the Savannah River that generates hydroelectric power while supporting flood control, navigation, and water supply in the surrounding region.
  • E. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24549610c8190a069d6411ce5f661 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f1a4e16f9881908ea4bef465e3af11 completed April 29, 2026, 6:27 a.m.
Created at: April 17, 2026, 5:37 p.m.