Triple

T23394156
Position Surface form Disambiguated ID Type / Status
Subject Esterline Technologies E594102 entity
Predicate hasDivision P35 FINISHED
Object Sensors and Controls NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sensors and Controls | Statement: [Esterline Technologies, hasDivision, Sensors and Controls]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sensors and Controls
Context triple: [Esterline Technologies, hasDivision, Sensors and Controls]
  • A. Measurement & Control Solutions
    Measurement & Control Solutions is a Xylem Inc. division that provides technologies and services for measuring, monitoring, and managing water and related infrastructure systems.
  • B. Control Panels
    Control Panels are user-accessible system utilities on classic Macintosh computers that allow users to configure and customize various hardware and software settings.
  • C. Control System
    Control System is a critically acclaimed 2012 studio album by American rapper Ab-Soul, known for its dense lyricism, conceptual depth, and exploration of social and philosophical themes.
  • D. SCADA systems
    SCADA systems are industrial control platforms that monitor and manage critical infrastructure and manufacturing processes in real time, often integrating hardware, software, and communication networks for centralized supervision.
  • E. Power and Controls
    Power and Controls is a Collins Aerospace division specializing in aircraft power generation, distribution, and control systems for commercial and military aviation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sensors and Controls
Target entity description: Sensors and Controls is a division of Esterline Technologies that specializes in designing and manufacturing sensing, control, and instrumentation solutions for aerospace and defense applications.
  • A. Measurement & Control Solutions
    Measurement & Control Solutions is a Xylem Inc. division that provides technologies and services for measuring, monitoring, and managing water and related infrastructure systems.
  • B. Control Panels
    Control Panels are user-accessible system utilities on classic Macintosh computers that allow users to configure and customize various hardware and software settings.
  • C. Control System
    Control System is a critically acclaimed 2012 studio album by American rapper Ab-Soul, known for its dense lyricism, conceptual depth, and exploration of social and philosophical themes.
  • D. SCADA systems
    SCADA systems are industrial control platforms that monitor and manage critical infrastructure and manufacturing processes in real time, often integrating hardware, software, and communication networks for centralized supervision.
  • E. Power and Controls
    Power and Controls is a Collins Aerospace division specializing in aircraft power generation, distribution, and control systems for commercial and military aviation.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d2754fc819085deea939bde60ab completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f1a49eb3b881909da7f1c47c67c81f completed April 29, 2026, 6:26 a.m.
Created at: April 17, 2026, 5:36 p.m.