Triple

T23384906
Position Surface form Disambiguated ID Type / Status
Subject Vindafjord E593850 entity
Predicate hasTunnel P21069 FINISHED
Object Boknafjord Tunnel (planned connection) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boknafjord Tunnel (planned connection) | Statement: [Vindafjord, hasTunnel, Boknafjord Tunnel (planned connection)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boknafjord Tunnel (planned connection)
Context triple: [Vindafjord, hasTunnel, Boknafjord Tunnel (planned connection)]
  • A. Byfjord Tunnel
    The Byfjord Tunnel is an undersea road tunnel in Rogaland county, Norway, forming part of the main highway connection between the city of Stavanger and the island municipality of Rennesøy.
  • B. Bømlafjord Tunnel
    Bømlafjord Tunnel is a subsea road tunnel in Vestland county, Norway, forming part of the fixed link connection between the island municipality of Bømlo and the mainland.
  • C. Ryfylke Tunnel
    The Ryfylke Tunnel is a subsea road tunnel in southwestern Norway that ranks among the world’s longest and deepest undersea tunnels, connecting Stavanger with the Ryfylke region.
  • D. Nordhordland Tunnel
    The Nordhordland Tunnel is a subsea road tunnel in western Norway that connects the city of Bergen to the Nordhordland region as part of a major coastal highway route.
  • E. Finnøy Tunnel
    The Finnøy Tunnel is an undersea road tunnel in Norway that connects the island of Finnøy to the mainland road network.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Boknafjord Tunnel (planned connection)
Target entity description: The Boknafjord Tunnel (planned connection) is a proposed subsea road tunnel in Norway intended to improve regional connectivity by providing a direct link beneath the Boknafjorden.
  • A. Byfjord Tunnel
    The Byfjord Tunnel is an undersea road tunnel in Rogaland county, Norway, forming part of the main highway connection between the city of Stavanger and the island municipality of Rennesøy.
  • B. Bømlafjord Tunnel
    Bømlafjord Tunnel is a subsea road tunnel in Vestland county, Norway, forming part of the fixed link connection between the island municipality of Bømlo and the mainland.
  • C. Ryfylke Tunnel
    The Ryfylke Tunnel is a subsea road tunnel in southwestern Norway that ranks among the world’s longest and deepest undersea tunnels, connecting Stavanger with the Ryfylke region.
  • D. Nordhordland Tunnel
    The Nordhordland Tunnel is a subsea road tunnel in western Norway that connects the city of Bergen to the Nordhordland region as part of a major coastal highway route.
  • E. Finnøy Tunnel
    The Finnøy Tunnel is an undersea road tunnel in Norway that connects the island of Finnøy to the mainland road network.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d2754fc819085deea939bde60ab completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f1a497661c8190b52fa27419594989 completed April 29, 2026, 6:26 a.m.
Created at: April 17, 2026, 5:35 p.m.