Triple
T23382296
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Traité théorique et pratique de l’art de bâtir |
E593780
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | construction treatise |
C32509
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: construction treatise Context triple: [Traité théorique et pratique de l’art de bâtir, instanceOf, construction treatise]
-
A.
engineering treatise
chosen
An engineering treatise is a comprehensive, systematically organized written work that rigorously analyzes, explains, and documents engineering principles, methods, designs, or systems.
-
B.
construction technique
A construction technique is a specific method or process used to assemble materials and components into a built structure safely, efficiently, and according to design requirements.
-
C.
construction material
A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
-
D.
canonical treatise
A canonical treatise is an authoritative, foundational written work that systematically presents and shapes the core principles, methods, or doctrines of a field or tradition.
-
E.
engineering journal
An engineering journal is a periodical publication that presents peer-reviewed research, technical developments, and practical applications in various fields of engineering.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d268a50819095f2fd479da8ef3f |
completed | April 17, 2026, 4:17 p.m. |
Created at: April 17, 2026, 5:34 p.m.