Triple

T23378412
Position Surface form Disambiguated ID Type / Status
Subject City Hall Concourse E593669 entity
Predicate instanceOf P0 FINISHED
Object underground pedestrian passageway C4955 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: underground pedestrian passageway
Context triple: [City Hall Concourse, instanceOf, underground pedestrian passageway]
  • A. underground structure chosen
    An underground structure is a man-made construction built below the earth’s surface to provide space, protection, or support for various human activities or infrastructure.
  • B. roadway underpass
    A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
  • C. ropeway
    A ropeway is an aerial transport system in which carriers such as cabins or chairs are suspended from and moved by one or more overhead cables between fixed terminals.
  • D. underground rail corridor
    An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
  • E. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d268a50819095f2fd479da8ef3f completed April 17, 2026, 4:17 p.m.
Created at: April 17, 2026, 5:33 p.m.