Triple
T23369688
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Zeya Hydroelectric Power Station |
E593427
|
entity |
| Predicate | commissioningEndYear |
P152456
|
FINISHED |
| Object | 1980 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1980 | Statement: [Zeya Hydroelectric Power Station, commissioningEndYear, 1980]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: commissioningEndYear Context triple: [Zeya Hydroelectric Power Station, commissioningEndYear, 1980]
-
A.
commissioningEndDate
Indicates the date on which the commissioning process or commissioning-related responsibilities are completed or terminated.
-
B.
commissioningYearUnit1
Indicates the time unit (e.g., year, month) used to express the commissioning year of the first unit.
-
C.
commissioningYearUnit3
Indicates the year in which the third unit of an asset, facility, or system was officially commissioned and put into operation.
-
D.
decommissioningEndDate
Indicates the date on which a decommissioning process or status for something is completed or officially ends.
-
E.
plannedEndYear
Indicates the calendar year in which an activity, project, or plan is intended or scheduled to be completed.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d2593c88190bcdf4a716a94ccb2 |
completed | April 17, 2026, 4:17 p.m. |
| NER | Named-entity recognition | batch_69f1a0aff84c8190a5a6bf52adae1c9a |
completed | April 29, 2026, 6:09 a.m. |
| PD | Predicate disambiguation | batch_69f061c7aaa48190a58ce93f87155ffc |
completed | April 28, 2026, 7:29 a.m. |
| PDg | Predicate description generation | batch_69f0bd4a0e408190ad8916faf23562d9 |
completed | April 28, 2026, 1:59 p.m. |
Created at: April 17, 2026, 5:32 p.m.