Triple

T23365025
Position Surface form Disambiguated ID Type / Status
Subject Kalpakkam E593291 entity
Predicate powerGridConnection P25653 FINISHED
Object Southern Regional Grid of India NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Southern Regional Grid of India | Statement: [Kalpakkam, powerGridConnection, Southern Regional Grid of India]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Southern Regional Grid of India
Context triple: [Kalpakkam, powerGridConnection, Southern Regional Grid of India]
  • A. Northern Regional Grid of India
    The Northern Regional Grid of India is a major interconnected power network that coordinates electricity generation and transmission across multiple northern Indian states to ensure reliable supply and grid stability.
  • B. Eastern Regional Grid of India
    The Eastern Regional Grid of India is a major interconnected power network that coordinates electricity generation, transmission, and distribution across the eastern states of the country.
  • C. North Eastern Regional Grid
    The North Eastern Regional Grid is a major power transmission network that supplies and coordinates electricity across India’s northeastern states as part of the national grid system.
  • D. Central Electricity Authority of India
    The Central Electricity Authority of India is a statutory government body responsible for technical and economic regulation, planning, and development of the country’s power sector.
  • E. Indian national grid
    The Indian national grid is the countrywide interconnected power transmission network that enables electricity generated across India to be distributed reliably and efficiently to consumers in all regions.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Southern Regional Grid of India
Target entity description: The Southern Regional Grid of India is a major interconnected electricity transmission network that coordinates power generation and distribution across the southern states of the country.
  • A. Northern Regional Grid of India
    The Northern Regional Grid of India is a major interconnected power network that coordinates electricity generation and transmission across multiple northern Indian states to ensure reliable supply and grid stability.
  • B. Eastern Regional Grid of India
    The Eastern Regional Grid of India is a major interconnected power network that coordinates electricity generation, transmission, and distribution across the eastern states of the country.
  • C. North Eastern Regional Grid
    The North Eastern Regional Grid is a major power transmission network that supplies and coordinates electricity across India’s northeastern states as part of the national grid system.
  • D. Central Electricity Authority of India
    The Central Electricity Authority of India is a statutory government body responsible for technical and economic regulation, planning, and development of the country’s power sector.
  • E. Indian national grid
    The Indian national grid is the countrywide interconnected power transmission network that enables electricity generated across India to be distributed reliably and efficiently to consumers in all regions.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d2593c88190bcdf4a716a94ccb2 completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f1a0ab7fc481908b496ec9b543eddd completed April 29, 2026, 6:09 a.m.
Created at: April 17, 2026, 5:31 p.m.