Triple

T23363881
Position Surface form Disambiguated ID Type / Status
Subject 1979 Air New Zealand Flight 901 crash E593257 entity
Predicate routeChange P82833 FINISHED
Object last-minute change to flight coordinates LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: last-minute change to flight coordinates | Statement: [1979 Air New Zealand Flight 901 crash, routeChange, last-minute change to flight coordinates]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: routeChange
Context triple: [1979 Air New Zealand Flight 901 crash, routeChange, last-minute change to flight coordinates]
  • A. route
    Indicates that one entity serves as a path or course used to travel or move between locations associated with another entity.
  • B. routeVia
    Indicates that a connection, path, or communication between two points is established or carried out through an intermediate location, node, or channel.
  • C. routeAffected chosen
    Indicates that a transportation route is impacted or disrupted in some way, such as by delays, closures, or changes in service.
  • D. routeSetting
    Indicates that one entity configures or defines the path or course to be followed by another entity (such as a vehicle, signal, or data flow).
  • E. transitionTo
    Indicates a change in state, condition, or phase from one defined status to another.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d2593c88190bcdf4a716a94ccb2 completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f1a0aac4248190a4663ed12aed6856 completed April 29, 2026, 6:09 a.m.
PD Predicate disambiguation batch_69f061c7aaa48190a58ce93f87155ffc completed April 28, 2026, 7:29 a.m.
Created at: April 17, 2026, 5:31 p.m.