Triple
T23357945
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | GS9 Crew |
E593101
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | street crew |
C44245
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: street crew Context triple: [GS9 Crew, instanceOf, street crew]
-
A.
crosstown street
A crosstown street is a roadway that runs perpendicular to a city's primary directional grid, providing lateral connections across town between major thoroughfares or neighborhoods.
-
B.
street ensemble
A street ensemble is a group of performers who collaboratively present music, theater, or other live arts in public urban spaces, often informally and interactively engaging passersby.
-
C.
street
A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
-
D.
hip hop organization
chosen
A hip hop organization is a structured group or institution dedicated to promoting, supporting, and organizing activities related to hip hop culture, including music, dance, art, and community engagement.
-
E.
streetcar corridor
A streetcar corridor is a designated urban transit route where streetcars operate along fixed tracks, typically integrated into city streets, to provide frequent, high-capacity public transportation and support adjacent mixed-use development.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d24d2a4819092e6ede74c2a918d |
completed | April 17, 2026, 4:17 p.m. |
Created at: April 17, 2026, 5:29 p.m.