Triple
T23348962
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rio Zêzere |
E591951
|
entity |
| Predicate | formsReservoir |
P11309
|
FINISHED |
| Object | Bouçã Reservoir |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bouçã Reservoir | Statement: [Rio Zêzere, formsReservoir, Bouçã Reservoir]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Bouçã Reservoir Context triple: [Rio Zêzere, formsReservoir, Bouçã Reservoir]
-
A.
Bouçã Reservoir
chosen
Bouçã Reservoir is a man-made lake in central Portugal created by a hydroelectric dam on the Zêzere River.
-
B.
Cabril Reservoir
Cabril Reservoir is a major artificial lake in central Portugal, created by a dam on the Zêzere River and used for hydroelectric power generation, water storage, and recreation.
-
C.
Carraízo reservoir
Carraízo Reservoir is a major water storage lake in Puerto Rico that serves as a key source of drinking water and flood control for the San Juan metropolitan area.
-
D.
Bouçã Dam
Bouçã Dam is a hydroelectric dam and reservoir located on the Zêzere River in central Portugal.
-
E.
Montijo Reservoir
Montijo Reservoir is an artificial lake and water storage facility located within Spain’s Guadiana River basin, used primarily for irrigation, water supply, and regional water management.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d20e3d08190bcede87673cafb25 |
completed | April 17, 2026, 4:17 p.m. |
| NER | Named-entity recognition | batch_69f199cb2a3c8190a5c0c8d8735256c7 |
completed | April 29, 2026, 5:40 a.m. |
Created at: April 17, 2026, 5:19 p.m.