Triple
T23340785
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gare de Chambéry-Challes-les-Eaux |
E591728
|
entity |
| Predicate | railwayLine |
P848
|
FINISHED |
| Object | Saint-André-le-Gaz–Chambéry railway |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Saint-André-le-Gaz–Chambéry railway | Statement: [Gare de Chambéry-Challes-les-Eaux, railwayLine, Saint-André-le-Gaz–Chambéry railway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Saint-André-le-Gaz–Chambéry railway Context triple: [Gare de Chambéry-Challes-les-Eaux, railwayLine, Saint-André-le-Gaz–Chambéry railway]
-
A.
Aosta–Pré-Saint-Didier railway
The Aosta–Pré-Saint-Didier railway is a regional rail line in Italy’s Aosta Valley that connects the city of Aosta with the mountain resort area near Courmayeur.
-
B.
La Roche-sur-Foron–Annemasse railway
The La Roche-sur-Foron–Annemasse railway is a regional rail line in southeastern France that connects the town of La Roche-sur-Foron to the cross-border hub of Annemasse near the Swiss border.
-
C.
Annemasse–Geneva railway
The Annemasse–Geneva railway is a cross-border rail line linking the French town of Annemasse with the Swiss city of Geneva, serving as an important regional and international commuter route.
-
D.
Dijon–Vallorbe railway
The Dijon–Vallorbe railway is an international rail line linking Dijon in France to Vallorbe in Switzerland, forming a key route across the Jura for both passenger and freight traffic.
-
E.
Maurienne railway line
The Maurienne railway line is a major rail route through the Maurienne Valley in the French Alps, forming part of a key international corridor between France and Italy.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Saint-André-le-Gaz–Chambéry railway Target entity description: The Saint-André-le-Gaz–Chambéry railway is a regional rail line in southeastern France that connects the Lyon area to the city of Chambéry through the Isère and Savoie departments.
-
A.
Aosta–Pré-Saint-Didier railway
The Aosta–Pré-Saint-Didier railway is a regional rail line in Italy’s Aosta Valley that connects the city of Aosta with the mountain resort area near Courmayeur.
-
B.
La Roche-sur-Foron–Annemasse railway
The La Roche-sur-Foron–Annemasse railway is a regional rail line in southeastern France that connects the town of La Roche-sur-Foron to the cross-border hub of Annemasse near the Swiss border.
-
C.
Annemasse–Geneva railway
The Annemasse–Geneva railway is a cross-border rail line linking the French town of Annemasse with the Swiss city of Geneva, serving as an important regional and international commuter route.
-
D.
Dijon–Vallorbe railway
The Dijon–Vallorbe railway is an international rail line linking Dijon in France to Vallorbe in Switzerland, forming a key route across the Jura for both passenger and freight traffic.
-
E.
Maurienne railway line
The Maurienne railway line is a major rail route through the Maurienne Valley in the French Alps, forming part of a key international corridor between France and Italy.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d20e3d08190bcede87673cafb25 |
completed | April 17, 2026, 4:17 p.m. |
| NER | Named-entity recognition | batch_69f198329d9c8190992627afa9b54bed |
completed | April 29, 2026, 5:33 a.m. |
Created at: April 17, 2026, 5:18 p.m.