Triple

T23333240
Position Surface form Disambiguated ID Type / Status
Subject Northrop N-156 project E591502 entity
Predicate instanceOf P0 FINISHED
Object jet fighter development project C16232 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: jet fighter development project
Context triple: [Northrop N-156 project, instanceOf, jet fighter development project]
  • A. Japanese fighter aircraft development program
    A Japanese fighter aircraft development program is an organized, government- and industry-led effort to research, design, test, and produce new generations of combat aircraft to meet Japan’s strategic, technological, and defense requirements.
  • B. bomber aircraft project
    A bomber aircraft project is a coordinated effort to design, develop, test, and produce an aircraft optimized for delivering explosive ordnance to ground or sea targets under specified operational requirements.
  • C. fighter aircraft
    A fighter aircraft is a fast, highly maneuverable military airplane designed primarily to secure air superiority by engaging and destroying enemy aircraft in combat.
  • D. unbuilt aircraft project chosen
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • E. military project
    A military project is a coordinated, goal-driven initiative undertaken by armed forces or defense organizations to develop, test, or deploy capabilities, technologies, or operations that enhance national security and military effectiveness.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d20156c81908c5c53195bd9c738 completed April 17, 2026, 4:17 p.m.
Created at: April 17, 2026, 5:16 p.m.