Triple

T23323395
Position Surface form Disambiguated ID Type / Status
Subject Mayflower Line E591219 entity
Predicate instanceOf P0 FINISHED
Object suburban railway route C74 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: suburban railway route
Context triple: [Mayflower Line, instanceOf, suburban railway route]
  • A. suburban railway corridor
    A suburban railway corridor is a dedicated rail route connecting city centers with surrounding residential suburbs, designed to support frequent, high-capacity commuter train services.
  • B. rail route
    A rail route is a defined path or corridor along which trains operate between specified locations, following a scheduled sequence of stops and track segments.
  • C. suburban commuter train
    A suburban commuter train is a passenger rail service designed to transport people efficiently between residential suburbs and urban centers, typically operating on fixed schedules with frequent stops during peak travel times.
  • D. railway route
    A railway route is a defined path or corridor along which trains operate between specified locations, following designated tracks, schedules, and operational rules.
  • E. commuter rail line chosen
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d1effe4819096907f95f610dbff completed April 17, 2026, 4:17 p.m.
Created at: April 17, 2026, 5:07 p.m.