Triple

T233152
Position Surface form Disambiguated ID Type / Status
Subject German 6th Army E4450 entity
Predicate finalOperations P10173 FINISHED
Object defensive battles in Eastern Europe LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: defensive battles in Eastern Europe | Statement: [German 6th Army, finalOperations, defensive battles in Eastern Europe]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalOperations
Context triple: [German 6th Army, finalOperations, defensive battles in Eastern Europe]
  • A. finalStep
    Indicates that an action or state represents the last step or concluding stage in a process or sequence.
  • B. finalDisposition
    Indicates the ultimate outcome, status, or resolution assigned to an entity after all relevant processes or decisions are complete.
  • C. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • D. productionEnd
    Indicates that a production process, activity, or run has come to its completion or final stopping point.
  • E. operation
    Indicates that one entity performs, carries out, or controls the functioning of another entity or system.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a257363ffc81909757bde7ab3404da completed Feb. 28, 2026, 2:47 a.m.
NER Named-entity recognition batch_69a25f14f72081908182e76300b59358 completed Feb. 28, 2026, 3:20 a.m.
PD Predicate disambiguation batch_69a25b5c8c888190b5544e687736b373 completed Feb. 28, 2026, 3:05 a.m.
PDg Predicate description generation batch_69a25f1450f08190872bcf58a32d506b completed Feb. 28, 2026, 3:20 a.m.
Created at: Feb. 28, 2026, 2:53 a.m.