Triple

T23303056
Position Surface form Disambiguated ID Type / Status
Subject Lowe’s Path E590356 entity
Predicate namedAfter P63 FINISHED
Object Lowe family (local trail builders) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lowe family (local trail builders) | Statement: [Lowe’s Path, namedAfter, Lowe family (local trail builders)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lowe family (local trail builders)
Context triple: [Lowe’s Path, namedAfter, Lowe family (local trail builders)]
  • A. Friends of the Mountains-to-Sea Trail
    Friends of the Mountains-to-Sea Trail is a nonprofit organization dedicated to supporting, maintaining, and promoting North Carolina’s Mountains-to-Sea Trail through volunteer work, advocacy, and community engagement.
  • B. Ann and Roy Butler Hike-and-Bike Trail
    The Ann and Roy Butler Hike-and-Bike Trail is a popular multi-use recreational path encircling downtown Austin’s Lady Bird Lake, known for its scenic waterfront views and heavy use by walkers, runners, and cyclists.
  • C. Westwoods Trails
    Westwoods Trails is an extensive network of hiking paths and natural areas known for its rocky terrain, caves, and scenic woodlands in Guilford, Connecticut.
  • D. Wilacre Park trail network
    The Wilacre Park trail network is a popular system of hiking paths in the eastern Santa Monica Mountains of Los Angeles, known for its accessible urban nature, canyon scenery, and connections to larger regional trails.
  • E. Greenprints Trail System
    The Greenprints Trail System is a network of multi-use walking and biking trails and greenways in Woodstock, Georgia, designed to connect parks, neighborhoods, and downtown areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lowe family (local trail builders)
Target entity description: The Lowe family are notable local trail builders recognized for their pioneering work in constructing and maintaining mountain paths in the area.
  • A. Friends of the Mountains-to-Sea Trail
    Friends of the Mountains-to-Sea Trail is a nonprofit organization dedicated to supporting, maintaining, and promoting North Carolina’s Mountains-to-Sea Trail through volunteer work, advocacy, and community engagement.
  • B. Ann and Roy Butler Hike-and-Bike Trail
    The Ann and Roy Butler Hike-and-Bike Trail is a popular multi-use recreational path encircling downtown Austin’s Lady Bird Lake, known for its scenic waterfront views and heavy use by walkers, runners, and cyclists.
  • C. Westwoods Trails
    Westwoods Trails is an extensive network of hiking paths and natural areas known for its rocky terrain, caves, and scenic woodlands in Guilford, Connecticut.
  • D. Wilacre Park trail network
    The Wilacre Park trail network is a popular system of hiking paths in the eastern Santa Monica Mountains of Los Angeles, known for its accessible urban nature, canyon scenery, and connections to larger regional trails.
  • E. Greenprints Trail System
    The Greenprints Trail System is a network of multi-use walking and biking trails and greenways in Woodstock, Georgia, designed to connect parks, neighborhoods, and downtown areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d1c0ecc8190a355aa229f06d0e0 completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f1972406a08190bbf355cc7a9f8432 completed April 29, 2026, 5:29 a.m.
Created at: April 17, 2026, 5:04 p.m.