Triple

T23300017
Position Surface form Disambiguated ID Type / Status
Subject The Ocean Cleanup E590275 entity
Predicate hasProject P14971 FINISHED
Object The Interceptor river program NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: The Interceptor river program | Statement: [The Ocean Cleanup, hasProject, The Interceptor river program]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: The Interceptor river program
Context triple: [The Ocean Cleanup, hasProject, The Interceptor river program]
  • A. Orange River Project
    The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
  • B. Yakima Project
    The Yakima Project is a major federal water management and irrigation system in central Washington State that supplies water for agriculture, municipalities, and fish and wildlife habitat.
  • C. Yadkin Project
    The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
  • D. Newlands Reclamation Project
    The Newlands Reclamation Project is one of the earliest U.S. federal irrigation projects, designed to divert water from the Truckee and Carson Rivers to transform arid Nevada lands into productive agricultural areas.
  • E. Rough River Dam project
    The Rough River Dam project is a U.S. Army Corps of Engineers flood-control and recreation initiative in Kentucky centered on the construction and management of Rough River Lake and its associated dam infrastructure.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: The Interceptor river program
Target entity description: The Interceptor river program is The Ocean Cleanup’s initiative to deploy solar-powered, automated systems in rivers worldwide to capture plastic waste before it reaches the ocean.
  • A. Orange River Project
    The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
  • B. Yakima Project
    The Yakima Project is a major federal water management and irrigation system in central Washington State that supplies water for agriculture, municipalities, and fish and wildlife habitat.
  • C. Yadkin Project
    The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
  • D. Newlands Reclamation Project
    The Newlands Reclamation Project is one of the earliest U.S. federal irrigation projects, designed to divert water from the Truckee and Carson Rivers to transform arid Nevada lands into productive agricultural areas.
  • E. Rough River Dam project
    The Rough River Dam project is a U.S. Army Corps of Engineers flood-control and recreation initiative in Kentucky centered on the construction and management of Rough River Lake and its associated dam infrastructure.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d1c0ecc8190a355aa229f06d0e0 completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f196d2b5dc819084b4d0290184de62 completed April 29, 2026, 5:27 a.m.
Created at: April 17, 2026, 5:04 p.m.