Triple
T23300017
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Ocean Cleanup |
E590275
|
entity |
| Predicate | hasProject |
P14971
|
FINISHED |
| Object | The Interceptor river program |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: The Interceptor river program | Statement: [The Ocean Cleanup, hasProject, The Interceptor river program]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: The Interceptor river program Context triple: [The Ocean Cleanup, hasProject, The Interceptor river program]
-
A.
Orange River Project
The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
-
B.
Yakima Project
The Yakima Project is a major federal water management and irrigation system in central Washington State that supplies water for agriculture, municipalities, and fish and wildlife habitat.
-
C.
Yadkin Project
The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
-
D.
Newlands Reclamation Project
The Newlands Reclamation Project is one of the earliest U.S. federal irrigation projects, designed to divert water from the Truckee and Carson Rivers to transform arid Nevada lands into productive agricultural areas.
-
E.
Rough River Dam project
The Rough River Dam project is a U.S. Army Corps of Engineers flood-control and recreation initiative in Kentucky centered on the construction and management of Rough River Lake and its associated dam infrastructure.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: The Interceptor river program Target entity description: The Interceptor river program is The Ocean Cleanup’s initiative to deploy solar-powered, automated systems in rivers worldwide to capture plastic waste before it reaches the ocean.
-
A.
Orange River Project
The Orange River Project is a major South African water resource and irrigation scheme centered on large dams and canals along the Orange River to provide hydroelectric power, irrigation, and water supply to arid regions.
-
B.
Yakima Project
The Yakima Project is a major federal water management and irrigation system in central Washington State that supplies water for agriculture, municipalities, and fish and wildlife habitat.
-
C.
Yadkin Project
The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
-
D.
Newlands Reclamation Project
The Newlands Reclamation Project is one of the earliest U.S. federal irrigation projects, designed to divert water from the Truckee and Carson Rivers to transform arid Nevada lands into productive agricultural areas.
-
E.
Rough River Dam project
The Rough River Dam project is a U.S. Army Corps of Engineers flood-control and recreation initiative in Kentucky centered on the construction and management of Rough River Lake and its associated dam infrastructure.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d1c0ecc8190a355aa229f06d0e0 |
completed | April 17, 2026, 4:17 p.m. |
| NER | Named-entity recognition | batch_69f196d2b5dc819084b4d0290184de62 |
completed | April 29, 2026, 5:27 a.m. |
Created at: April 17, 2026, 5:04 p.m.