Triple
T23296511
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Alberto de Palacio |
E590184
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Spanish engineer |
C47479
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Spanish engineer Context triple: [Alberto de Palacio, instanceOf, Spanish engineer]
-
A.
Portuguese engineer
A Portuguese engineer is a professional from Portugal who applies scientific, mathematical, and technical knowledge to design, develop, and optimize systems, structures, or technologies across various engineering fields.
-
B.
Spanish cleric
A Spanish cleric is a religious official from Spain, typically ordained within the Catholic Church, responsible for leading worship, administering sacraments, and providing spiritual guidance to the faithful.
-
C.
Catalan architect
A Catalan architect is a designer of buildings and spaces from the Catalonia region whose work reflects its cultural, historical, and often modernist architectural traditions.
-
D.
Spanish person
A Spanish person is an individual who is a citizen or national of Spain, typically sharing in its cultural, historical, and linguistic heritage.
-
E.
Spanish civil servant
A Spanish civil servant is a public sector employee who, after passing competitive examinations, works for Spain’s public administrations performing administrative, technical, or professional duties in service of the general interest under a statutory regime.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d1af9d88190a0b9b5e8fa608618 |
completed | April 17, 2026, 4:17 p.m. |
Created at: April 17, 2026, 5:03 p.m.