Triple
T23296422
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Córdoba Central railway station |
E590182
|
entity |
| Predicate | railwayLine |
P848
|
FINISHED |
| Object | Madrid–Cádiz rail corridor |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Madrid–Cádiz rail corridor | Statement: [Córdoba Central railway station, railwayLine, Madrid–Cádiz rail corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Madrid–Cádiz rail corridor Context triple: [Córdoba Central railway station, railwayLine, Madrid–Cádiz rail corridor]
-
A.
Madrid–Murcia railway
The Madrid–Murcia railway is a major rail line in Spain that connects the capital city Madrid with the southeastern city of Murcia, serving as an important corridor for both passenger and freight transport.
-
B.
Madrid–Valencia de Alcántara railway
The Madrid–Valencia de Alcántara railway is a major rail line in western Spain that connects Madrid with the Portuguese border near Valencia de Alcántara, serving as an important route for both passenger and freight traffic.
-
C.
Madrid–Valencia railway
The Madrid–Valencia railway is a major Spanish rail line connecting the nation’s capital with the Mediterranean port city of Valencia, serving as an important corridor for both passenger and freight transport.
-
D.
Madrid–Alicante railway
The Madrid–Alicante railway is a major Spanish rail line connecting the capital Madrid with the Mediterranean coastal city of Alicante, serving as an important corridor for both passenger and freight transport.
-
E.
Madrid–Andalusia railway
The Madrid–Andalusia railway is a major rail line in Spain that connects the capital, Madrid, with the southern region of Andalusia, serving as a key corridor for both passenger and freight transport.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Madrid–Cádiz rail corridor Target entity description: The Madrid–Cádiz rail corridor is a major Spanish railway route that connects the capital Madrid with the southern coastal city of Cádiz, passing through key hubs such as Córdoba.
-
A.
Madrid–Murcia railway
The Madrid–Murcia railway is a major rail line in Spain that connects the capital city Madrid with the southeastern city of Murcia, serving as an important corridor for both passenger and freight transport.
-
B.
Madrid–Valencia de Alcántara railway
The Madrid–Valencia de Alcántara railway is a major rail line in western Spain that connects Madrid with the Portuguese border near Valencia de Alcántara, serving as an important route for both passenger and freight traffic.
-
C.
Madrid–Valencia railway
The Madrid–Valencia railway is a major Spanish rail line connecting the nation’s capital with the Mediterranean port city of Valencia, serving as an important corridor for both passenger and freight transport.
-
D.
Madrid–Alicante railway
The Madrid–Alicante railway is a major Spanish rail line connecting the capital Madrid with the Mediterranean coastal city of Alicante, serving as an important corridor for both passenger and freight transport.
-
E.
Madrid–Andalusia railway
chosen
The Madrid–Andalusia railway is a major rail line in Spain that connects the capital, Madrid, with the southern region of Andalusia, serving as a key corridor for both passenger and freight transport.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d1af9d88190a0b9b5e8fa608618 |
completed | April 17, 2026, 4:17 p.m. |
| NER | Named-entity recognition | batch_69f196cfc79081909966638cec48cf60 |
completed | April 29, 2026, 5:27 a.m. |
Created at: April 17, 2026, 5:03 p.m.