Triple

T23267493
Position Surface form Disambiguated ID Type / Status
Subject Pilmaiquén River E588191 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Pilmaiquén Hydroelectric Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pilmaiquén Hydroelectric Plant | Statement: [Pilmaiquén River, hasHydroelectricPlant, Pilmaiquén Hydroelectric Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pilmaiquén Hydroelectric Plant
Context triple: [Pilmaiquén River, hasHydroelectricPlant, Pilmaiquén Hydroelectric Plant]
  • A. Queltehues hydroelectric plant
    The Queltehues hydroelectric plant is a power-generating facility in Chile that harnesses the flow of the Maipo River to produce electricity.
  • B. Comahue hydroelectric complex
    The Comahue hydroelectric complex is a major system of dams and power plants in Argentina’s Comahue region that harnesses the flow of rivers such as the Limay to generate electricity.
  • C. Alicurá Hydroelectric Power Station
    Alicurá Hydroelectric Power Station is a major hydroelectric facility in Argentina that generates electricity using water impounded by the Alicurá Dam on the Limay River.
  • D. La Higuera hydroelectric power plant
    La Higuera hydroelectric power plant is a Chilean hydropower station that forms part of the Tinguiririca hydroelectric complex, generating renewable electricity from the Tinguiririca River.
  • E. Maria Cristina Hydroelectric Plant
    The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Pilmaiquén Hydroelectric Plant
Target entity description: The Pilmaiquén Hydroelectric Plant is a power-generating facility in southern Chile that harnesses the flow of the Pilmaiquén River to produce electricity for the regional grid.
  • A. Queltehues hydroelectric plant
    The Queltehues hydroelectric plant is a power-generating facility in Chile that harnesses the flow of the Maipo River to produce electricity.
  • B. Comahue hydroelectric complex
    The Comahue hydroelectric complex is a major system of dams and power plants in Argentina’s Comahue region that harnesses the flow of rivers such as the Limay to generate electricity.
  • C. Alicurá Hydroelectric Power Station
    Alicurá Hydroelectric Power Station is a major hydroelectric facility in Argentina that generates electricity using water impounded by the Alicurá Dam on the Limay River.
  • D. La Higuera hydroelectric power plant
    La Higuera hydroelectric power plant is a Chilean hydropower station that forms part of the Tinguiririca hydroelectric complex, generating renewable electricity from the Tinguiririca River.
  • E. Maria Cristina Hydroelectric Plant
    The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d148adc819088efbf42672604e9 completed April 17, 2026, 4:17 p.m.
NER Named-entity recognition batch_69f19570fcc0819091df22140828155b completed April 29, 2026, 5:21 a.m.
Created at: April 17, 2026, 4:38 p.m.